The past few weeks have seen a flurry of activity around framing - in the rain. It hasn't been fun for the framers, but the house has really started to take shape. In about a week, the roof will be up and we can start the process of drying out the house.
Thanks to the heroic efforts of Mr. Casey and Mr. Tim, and our wives who make it all possible, we also started to build the retaining walls that will grace three out of four of our property lines.
The walls will contain 600 blocks total, plus about 30 cap pieces and 24 corner pieces. That's a lot of stone. We thought we could get that laid in a week, but I grossly underestimated the effort needed.
| Seeing the exterior walls of the main floor go up really made the place feel like a house. It also started to make all the spaces real, and not just drawings on a plan. |
| After about a week, the main floor really started to take shape. Here are some internal walls going up, with the wall in the center dividing the kitchen space (left) and a hall to the right. |
| Part of the main floor work was installing the old post from the original Sunnyside house. It'll be near the entrance. This piece of wood was originally a beam in the basement. It was milled 105 years ago, and with some light sanding, you can still see the old mill marks on the wood. Super cool. We're really happy to have a piece of the old house used so prominently. It's a great testament to the history of the house and the generations before us who've made this all possible. |
| In my effort to get the mini "unstuck", I may have damaged part of the water proofing around the foundation. |
| Nailed it. |
| Once in the back, we moved the mini to the south side and started to excavate for the first retaining wall. Took about 500% longer than I estimated. |
| Once broken up, Mr. Casey made short work of clearing out the rest of the area for the retaining wall. |
| You can see the start of the wall in the background. The wall will continue up along the left side of the image and into the foreground. |
| The wall in the back section will eventually be 5 stones high. Here you can see the overall size of the egress space for the MIL bedroom windows. |
| This is looking down on the wall from the second story. That's a lot of blocks! |
| When excavating for the walls we had lots of large chunks of concrete from the broken ultra blocks. So I dug a big hole.... |
| ....and buried them. They're about 8' down. Very cost effective. |
| As the second story floor was being put in place, they had to reinforce the main floor interior walls to hold the floor. The result: a spider web of braces. |
| Once the floor was secure, braces were taken out. Here's a shot looking from the back end of the kitchen towards the front door. Same basic location as the photo above. |
| Slowly, the second story has been taking shape. You can see the north and south exterior walls up. |